31. Whitehall Re-meandering

Themes: Flow; Water Quality, Habitats and Wildlife

Objectives:

  • That whatever the flow level, the river and its associated habitats, including banks and floodplains, are managed to support chalk stream species
  • That water quality, temperature and river bed quality are such that they support chalk stream ecology

Project description

to return the Beane back to its original channel.

 The River Beane above Whitehall has been straightened, deepened and widened. The project aims to re-connect some relic meander on the right bank above Whitehall to re-create a more natural channel with more diverse flows and habitats.

Grid reference: TL28452199
Project lead: Affinity Water
Project partners: Landowner
Funding source: Affinity Water
Project start: 2017
Project end: 2017
Contact for more information: This email address is being protected from spambots. You need JavaScript enabled to view it.

Design by LTD Design Consultants and build by Garganey Consulting.