We have been selectivly removing trees that may pose a risk to the footpath running alongside the channel, or to the stability of the bank between the mill race and the River Beane where the breach as occurred. 

 Our contractors have been on site recently carrying out this work and hope to finish in the coming days.

Design by LTD Design Consultants and build by Garganey Consulting.