The second phase of the Sherrardswood project is about to start.

This will include fencing along the right bank and the installation of two cattle drinking areas which will be covered with gravels to prevent silt from getting into the river. The gravels are being donated by Tarmac and will be locally won gravels from Panshanger quarry.

Design by LTD Design Consultants and build by Garganey Consulting.